ID
Codigo
Nombre
Clave
Empresa
Labor
Rendimiento
Implementación
Cerrar
Localisation
Coordenadas
Puerto principal
Tipo
Observación
Pagina
Estado

PbAg-S = Lead-Silver Smelter || AuE = Gold Extraction || FL= Fluorit Washing || CuE = Copper Extraction || HgE = Extraction Mercurio



Google Maps http://minasdealmeria.es/mining/wp-content/kml/Fundi_Nijar.kml >



ScreenShot008


link11   Weitergehende Informationen ,Bilder,sowie Überlegungen zu diesem Grubenkomplex finden sich
ACTIVIDADES DE LA EMPRESA MINERA “CAMIMET” EN LA ZONA DE LA SIERRA DEL CABO DE GATA (ALMERIA)..-
LA MINERÍA EN LA SIERRA DEL CABO DE GATA (ALMERIA)
INSTALACIONES METALÚRGICAS CONTEMPORÁNEAS EN LA SIERRa DE CABO DE GATA (ALMERÍA)
La Mineria de Oro de Rodalquiar …
El Oro de Rodalquilar
THE RODALQUILAR GOLD MINE

Text by Don Gaunt

In 1989 would open the last gold extraction plant at Rodalquilar. It used the latest technology which was the method of leaching in piles (I.T.G.E., 1991). It permitted the treatment of large quantities of ore at low cost due to the small amount of crushing and milling required. The capacity of the installation was 200,000 tonnes per annum. It was designed and constructed by the Dutch firm CYMET. Production was estimated at 280kg of gold per annum. For the precipitation of the gold they used for the first time in Spain, columns of active carbon, followed by chemical refining then smelting. This was an improved and successful method of extraction, however, a fall in the price of gold forced the closure of operations in 1990.


Images by F.Ortiz

ScreenShot006
ScreenShot007